Folder: Capital Improvement Project III
  
5/2/2016 6:19 PMPulido, Jessica
Folder: Design Standards
  
1/4/2017 10:45 AMPulido, Jessica
Folder: FPMO
  
3/31/2015 6:26 PMMiller, Alan
Folder: Hazard Mitigation Plan
  
7/19/2016 4:17 PMWarne, Carina
Folder: ID Cards
  
10/28/2015 11:02 PMGutierrez, Robert
Folder: Information
  
4/2/2015 3:32 PMMiller, Alan
Folder: Master Plans
  
3/31/2015 11:52 AMMiller, Alan
Folder: Project Documents
  
2/9/2015 4:30 PMMiller, Alan
Folder: Reference Plans
  
4/2/2015 3:32 PMMiller, Alan
Folder: Request Forms
  
4/2/2015 3:32 PMMiller, Alan
Folder: Skyline Title Report
  
9/19/2016 3:53 PMMiller, Alan
Folder: Sustainability
  
6/23/2017 10:06 AMLin, Denise


  
  
  
  
Folder: CAN
  
4/5/2016 5:30 PMMiller, Alan
Folder: CSM
  
4/5/2016 5:30 PMMiller, Alan
Folder: Multivista
  
6/22/2015 4:46 PMPowell, Patricia "Pepper"
Folder: SKY
  
4/5/2016 5:30 PMMiller, Alan

  
  
  
  
Campus
  
  
  
  
Schedule
Project Description
Campus Impact
  
  
  
  
Contacts
  
  
  
12/11/20171/31/2018CSM B17 ModernizationCSMDisruption1/8/2018 6:00 AM12/16/2017 12:00 AM
CLOSED January 8 to January 15, 2018

 As part of the CSM B17 Modernization project, work will occur to widen the driveway entry to parking lot 4 Socrates Lot. The intent is to complete this part of the work before Spring Semester starts on January 16, 2018.  Due to this work, the Lot 4 entry will be CLOSED January 8 to January 15, 2018. This will impact the Flex Days on Jan 11 and 12.

Socrates Lot 4 driveway entry will be closed Jan 8 to Jan 15, 2018
PublishedHempel, Peter12/11/2017Stage 1

Peter Hempel

hempelp@smccd.edu

650-378-7336

102http://smccd.edu/construction/
  
12/11/20171/31/2018CSM B17 ModernizationCSMDisruption1/8/2018 6:00 AM12/16/2017 12:00 AM
CLOSED January 8 to January 15, 2018

 As part of the CSM B17 Modernization project, work will occur to widen the driveway entry to parking lot 4 Socrates Lot. The intent is to complete this part of the work before Spring Semester starts on January 16, 2018.  Due to this work, the Lot 4 entry will be CLOSED January 8 to January 15, 2018. This will impact the Flex Days on Jan 11 and 12.

Socrates Lot 4 driveway entry will be closed Jan 8 to Jan 15, 2018
PublishedHempel, Peter12/11/2017Stage 1

Peter Hempel

hempelp@smccd.edu

650-378-7336

103http://smccd.edu/construction/
  
12/11/20171/31/2018CSM B17 ModernizationCSMDisruption1/8/2018 6:00 AM12/16/2017 12:00 AM
CLOSED January 8 to January 15, 2018

 As part of the CSM B17 Modernization project, work will occur to widen the driveway entry to parking lot 4 Socrates Lot. The intent is to complete this part of the work before Spring Semester starts on January 16, 2018.  Due to this work, the Lot 4 entry will be CLOSED January 8 to January 15, 2018. This will impact the Flex Days on Jan 11 and 12.

Socrates Lot 4 driveway entry will be closed Jan 8 to Jan 15, 2018
PublishedHempel, Peter12/11/2017

Peter Hempel

hempelp@smccd.edu

650-378-7336

104http://smccd.edu/construction/
  
6/19/20177/14/2017District Wide Security Hardware Project CSMInformation Only6/26/2017 7:00 AM6/30/2017 6:00 PM
Monday - Friday 7:am-5:00pm
Door Hardware Upgrade: Non-ACAM Door locksets at offices, office service, conference rooms, workrooms, study/reading rooms, lounge, meeting rooms and classroom lab service doors will be replaced with hardware that provides improved security through push-button locking capability from inside of the classroom.  In addition to door hardware, a wall bumper will be installed on wall behind the door to protect the wall from damage.  This installation of Phase 2 will include CSM Buildings: B1, B3, B5, B7, B8, B9, B10, B12, B16, B17, B18, B19, B30, B34, B35, B36 and B46.

Thank you for your patience.
There should be no construction impact when classroom is in session.

LOCK FUNCTION:
New lock function:  To LOCK these doors, turn/push the inside lock button. Also at new office hardware, a push/turn of the inside lock button will give an advantage for the new lock to remain locked. The doors cannot be locked from the outside by a key.
Unlocking: The door will unlock on the outside by using your existing key, or request new one if your current key does not work.

Please go to Public Safety or submit a new key request if your existing key does not work. Thank you for your cooperation.
PublishedRocha, Virginia6/19/2017
Virginia Rocha
rochav@smccd.edu
650-378-7334
100http://smccd.edu/construction
  
6/20/20179/29/2017CSM Aquatics ProjectCSMPedestrian Access6/21/2017 12:00 AM8/18/2017 12:00 AM
7:00am-5:00pm

Underground water piping work at the traffic circle in front of Building 8 for pool heating retrofit. Scope includes work in B6 the pool mechanical room as well as trenching from the traffic circle to the front of the pool room. The traffic circle and adjacent sidewalks will be fenced off to protect pedestrians from construction. Walkways and ADA access will be blocked so please use an alternative route to the nearest entrance.

The area will be blocked starting 8 am June 21 and will be reopened before the beginning of Fall semester.

Area in front of Buidlings 6 & 8 will be inaccessible to predestrian and vehicular traffic.  Please use alternate routes. 

General construction noise including large machinery usage, hammering, cutting, digging.

PublishedLo, Thomas6/20/2017Stage 1
Thomas Lo
lot@smccd.edu
650 378-7319
101http://smccd.edu/construction/
  
5/21/201712/1/2017SKY Lot L ReconstructionSKYParking5/22/2017 7:00 AM11/30/2017 5:00 PM

Begin Date:

5/22/2017

Begin Time:

7:00 AM

End Date:

11/30/2017

End Time:

5:00 PM

Expansion of Parking Lot L to 500 paved spaces (currently 100 paved and 200 unpaved).  A new connection will be provided from the North Loop Road to Chilton Lane, which will become Lot T for staff parking.  The project includes accessible spaces, carpool and visitor spaces, security camera, landscaping and electric vehicle charging stations.​​
PARKING LOT C:
Beginning Monday, May 22, a chain link fence enclosure will be installed in part of Lot C for storage of Automobile Technology vehicles.  Work will be complete and vehicles moved in by Friday, June 2.

PARKING LOT L:
Wednesday, May 24, storage containers will be moved out of Lot L.
Thursday and Friday, May 25 and 26, underground utilities in Lot L will be located.
Beginning Tuesday, May 30, Lot L will be closed for reconstruction.
Construction will continue through the summer and fall, with the lot reopening in late November.

Traffic on the North Loop Road will be interrupted occasionally but briefly.

PublishedRocha, Virginia5/18/2017Stage 1
Name:Virginia Rocha
E-mail:rochav@smccd.edu
Telephone:(650)378-7334​

99http://smccd.edu/construction/
  
5/10/20175/11/2017Test itemCANDisruption5/10/2017 12:00 AM5/11/2017 12:00 AM

project descriptionj
campus impact
PublishedMiller, Alan5/10/2017
Contacts
98
  
2/9/20172/28/2017Electric Vehicle Charging Station Infrastructure ExpansionDISParking2/13/2017 8:00 AM2/17/2017 5:00 PM

Installation of 2 new EV Charging stations in District Office parking lot adjacent to existing stations. During this time, the parking spaces at the back of the District Office will be inaccessible so the contractor can complete their work. The current EV charging stations will also be inaccessible during this time.

InterMountain Electric will be trenching, drilling, and installing electrical equipment

Approximately 18 parking spaces will be unavailable for the duration of the construction.

Existing EV charging stations will be unavailable during the construction

PublishedHempel, Peter2/9/2017
Thomas Lo
lot@smccd.edu
650 378 7319
97http://smccd.edu/construction/
  
12/12/20161/21/2017Electric Vehicle Charging Station Infrastructure ExpansionSKYParking12/12/2016 12:00 PM1/20/2017 12:00 PM

Begin Date:

12/12/2016

Begin Time:

7:00 AM

End Date:

1/20/2017

End Time:

5:00 PM

Installation of 4 new EV Charging stations in Lot F behind B11 ​

InterMountain Electric will be trenching, drilling, and installing electrical equipment


PublishedFudge, Johnnie12/12/2016
Project Contact: 
Name:Johnnie Fudge
E-mail:fudgej@smccd.edu
Telephone:650 378-7341​

95
  
11/7/201611/30/2016Beethoven Lot 2 Parking Lot Soil TestCSMDisruption11/9/2016 7:30 AM11/9/2016 7:00 AM
November 9th, 2016 7:00am-5:00pm
Testing of soil at Beethoven Lot 2 parking lots for future possible site improvements.  A truck mounted auger will drill soil borings at 7 locations as shown on the below map.  Affected parking stalls will be marked-off with cones starting Tuesday night.  Soil borings will occur on Wednesday Nov. 9. 
Seven areas will be marked-off with cones to show that no parking is allowed in the immediate drilling areas.
PublishedHempel, Peter11/7/2016
Peter Hempel
hempelp@smccd.edu
650-378-7336
94http://smccd.edu/construction/
  
10/24/201612/31/2016CSM North Campus Safety EnhancementsCSMTraffic11/1/2016 8:00 AM11/30/2016 5:00 PM
Monday- Friday 7:00am-4:00pm

Provide improvements to the site for increased safety for students, staff and visitors.

Contractors will be working through the month of November to install fencing across the north end of Galileo Parking Lot 6. The impact from this work will be minimal due to the location. Work will also take place on the shoulder of the loop road, where contractors will install a curb and handrail for greater security for pedestrians. There should be minimal disruption to normal traffic and parking due to this work; pedestrians will need to avoid the work area.
PublishedFudge, Johnnie10/24/2016

Johnnie Fudge
fudgej@smccd.edu
650 378-7341
92
  
10/27/201610/29/2016DW Classroom Security HardwareSKYInformation Only10/28/2016 12:00 PM10/29/2016 12:00 PM

Begin Date:

10/28/2016

Begin Time:

8:00 AM

End Date:

10/28/2016

End Time:

5:00 PM


Door Cylinder Replacement:

Approximately 50 Schlage cylinders will be replaced at non-electronic classroom and laboratory doors. ​

The replacement will include Buildings: B1, B2, B4, B5, B7, B8, B10, B11, B19.


There should be no construction impact to class sessions. 
There should be no impact to accessing classrooms and laboratories.

PublishedRocha, Virginia10/27/2016
Name:Virginia Rocha
E-mail:rochav@smccd.edu
Telephone:650-378-7334​

93
  
7/28/20168/31/2016District Wide Classroom Security HardwareCSMInformation Only8/4/2016 7:00 AM8/10/2016 5:00 PM
7:00am -5:00pm Monday -Friday

Classroom Door Hardware Upgrade: Door hardware at non-electrified classroom and class laboratory doors will be replaced with hardware that provides improved security through push-button locking capability from inside of the classroom.  This installation phase will include CSM Buildings: B2, B4, B5, B10, B12, B14, B16, B18, B19, B35 and B46.

Thank you for your patience.

There should be no impact when classroom is in session.

PublishedRocha, Virginia7/28/2016

Virginia Rocha
rochav@smccd.edu
650-378-7334
91
  
7/27/20168/2/2016DW Classroom Security HardwareSKYInformation Only7/28/2016 12:00 AM8/1/2016 12:00 AM

Classroom Door Hardware Upgrade: Door hardware at non-electronic classroom and class laboratory doors will be replaced with hardware that provides improved security through push-button locking capability from inside of the classroom.  This installation phase will include Skyline Buildings: B1, B2, B4, B5, B7, B8, B10, B11, B19, B31 and B34.

Thank you for your patience.

There should be no impact when classroom is in session.

PublishedDoctor, John7/27/2016

​John Doctor

650.738.4166

doctorj@smccd.edu

90
  
6/20/20166/30/2016CSM Marie Curie Parking Lot Renovation projectCSMTraffic6/24/2016 7:00 AM6/24/2016 3:00 PM

​Installlation of a speed bump on the perimeter road adjscent to the Beethoven Parking Lot

A portion of the West Perimeter Rd will be closed off to traffic, starting just after the driveway entrance to Beethoven Lot 2 north to just ahead of the intersection with Theater Lane. Vehicles will be able to traverse the parking lot to continue on the loop road. Samtrans buses will be routed through the parking lot as well after leaving the bus drop-off area.

PublishedFudge, Johnnie6/20/2016

Johnnie Fudge
fudgej@smccd.edu
650 378-7341
89http://smccd.edu/construction/
  
6/19/20166/25/2016Building 2 Roof RepairsSKYNoise6/20/2016 12:00 AM6/24/2016 12:00 AM
Begin Date: 6/20/2016 Begin Time: 7:00 AM End Date: 6/24/2016 End Time: 5:00 PM

Building 2 Roof Repairs using a cold process application 

There will be minimal impact to pedestrian pathways. Demo work will be done in the mornings for the first couple of days to minimize sound impact.

PublishedDoctor, John6/16/2016

Name:John Doctor
E-mail:doctorj@smccd.edu
Telephone:(650) 738-4166​


88
  
5/30/20166/11/2016Building 2 Roof RepairsSKYNoise5/31/2016 7:00 AM6/10/2016 5:00 PM
Schedule: Begin Date: 5/31/2016 Begin Time: 7:00 AM End Date: 6/10/2016 End Time: 5:00 PM

Building 2 Roof Repairs using a cold process application 

There will be minimal impact to pedestrian pathways. Demo work will be done in the mornings for the first couple of days to minimize sound impact.

PublishedDoctor, John5/26/2016

Name:John Doctor
E-mail:doctorj@smccd.edu
Telephone:(650) 738-4166



86
  
5/24/20166/30/2016CSM Trees-Fire Mitigation and SafetyCSMTraffic5/31/2016 12:00 AM6/13/2016 12:00 AM

Removal of dead trees and debris from breakage of dead limbs of trees in the campus area, specifically North of B34. Removal of 1 tree in CDC Building 33 parking Lot.

Removal of three Eucalyptus trees along the loop road compromising road base and shading future solar array in Beethoven Parking Lot 2.

Scope to be performed during break in classes before summer school, mitigating campus travel disruption.

Work will require closure of one lane of traffic on loop road during portions of work. Since schedule for entire project is during a low traffic period minimal interruption is expected.

PublishedFudge, Johnnie5/24/2016

Johnnie Fudge
fudgej@smccd.edu
650 738-7341
84http://smccd.edu/construction/
  
5/27/20168/31/2016CSM Marie Curie Parking Lot RenovationCSMTraffic5/31/2016 12:00 AM6/10/2016 12:00 AM
Mon-Fri 7:00am-3:00pm

Installation of new speed cushions consistent with San Mateo County Fire requirements to allow for fire truck access through speed bumps

The campus perimeter road will be interrupted due to upgrading of the existing speed control barriers. This will require re-routing of vehicular traffic and detours as follows:
Tuesday, May 31: :  traffic diverted from W Hillsborough at CSM Dr.,  rejoining W Perimeter Rd., at north end of Marie Curie parking Lot 5. This detour will make entrances into Da Vinci, Socrates, and Marie Curie lots unavailable until Wednesday, June 1.

Detours will occur for additional 2 - 3 days of next week at the north end of the W Perimeter Rd (next to Galileo Lot 6) and on either side of Building 7 where additional speed cushions are to be replaced. The exact schedule for this work will be determined on Tuesday, May 31. Please look for these detours and drive carefully to maintain safe conditions for all.

PublishedFudge, Johnnie5/27/2016

Name:Johnnie Fudge
E-mail:fudgej@smccd.edu
Telephone:650 738-7341
87http://smccd.edu/construction/
  
5/24/20168/31/2016CSM Summer 2016 Projects-B36 Fume Hoods/Softball/Parking Lots/Fire MitigationCSMTraffic5/24/2016 12:00 AM8/16/2016 12:00 AM

1. CSM Softball Field Replacement project.  Schedule:  5/24/2016 - 7/18/16   Bulldog Lot 9 closed for the duration

2. CSM Building 36 Ventilation project.  Schedule:  5/31/16 - 8/16/16  new fume hoods for 2 Chemistry labs

3. Marie Curie parking Lot project.  Schedule:  5/31/16 - 8/16/16   Socrates Lot closed 5/13 - 6/12; Marie Curie closed 5/31/16 - 8/16/16. Loop road traffic interrupted 5/31/16 0- 6/12/16 for speed cushion install.

4. CSM North Campus Safety Enhancements project. Schedule: anticipate 7/5/16 - 9/1/16. Possible loop road interruptions at new guardrail installation.

5. CSM Tree Fire Mitigation project.  Schedule:  5/31/16 - 6/12/16. Beethoven Lot 2 - area closed for 1 - 2 days; CDC parking closed 1 day; loop road impacted north of B34 during debris removal

Above parking lot closures will cause minor interruption to usual parking, mainly for staff at Marie Curie. Most disruptive work in all areas are scheduled for the break before summer session.

PublishedFudge, Johnnie5/24/2016

Johnnie Fudge
fudgej@smccd.edu
650 738-7341
85http://smccd.edu/construction/ 
  
5/23/20167/8/2016DW Exterior Lighting Upgrades ProjectCANParking5/23/2016 7:00 AM7/8/2016 5:00 PM

The District is replacing existing exterior lighting throughout the Campus along pedestrian pathways, roadways, and buildings. This new lighting system, integrated with the existing Building Management System (BMS), will enable the District to manage the lighting system in a more efficient manner resulting in energy and operational savings, improved lighting levels, and improved safety and security.

 

See attached map showing areas and time frames when construction will take place on Campus beginning May 23, 2016, and ending approximately July 8, 2016.

 

We apologize for this inconvenience, but luck forward to the improvements.

There will be an impact to pedestrian pathways, certain parking stalls, and traffic patterns on a limited timeframe

PublishedDaniels, Stephen5/23/2016
Stephen Daniels, Construction Project Manager
danielss@smccd.edu
(650) 378-7343
83
  
4/1/20164/15/2016CSM Tree Fire Mitigation ProjectCSMTraffic4/1/2016 7:00 AM4/8/2016 5:00 PM
Monday-Friday 7:00am- 4:00pm

Project is continuing with removal of hazardous dead and dying trees in and around the College of San Mateo campus.

Current work requires a driving detour. This is an update of the vehicular paths of travel in and around the campus.

Traffic heading towards the north and east sides of the campus will be routed through Olympian Parking Lot 12 to rejoin the East Perimeter Rd. Though the intersection will be cleared, all vehicles must exercise great caution traveling through the areas next to the tree removal zones. The south portion of the east perimeter road will be closed from the junction with College Heights Rd (main entrance to the campus) to just below the access from Olympian Lot 12 behind CSM B5. The West Perimeter Rd remains open and accessible.

DraftRudovsky, Michele4/1/2016

​Johnnie Fudge

fudgej@smccd.edu

650 738-7341

82http://smccd.edu/construction/
  
3/15/20164/30/2016Colonnade Painting ProjectCSMPedestrian Access3/28/2016 8:00 AM4/1/2016 12:00 AM
8:00am - 5:00pm Monday- Friday

Painting of the colonnades between Buildings 14-15, 16-17, and in front on the de Vinci parking lot adjacent to the reflecting pool. 

Parking Lot 5 Marie Curie will be utilized for construction staging/storing of equipment and materials during Spring Recess 2016  Attached is a campus map showing the area of the Parking Lot 5 to be utilized.

Fencing and barricades will be installed by the contractors in the parking lot to delineate the areas.  Please drive carefully and use caution in these areas.

Impacts to the campus will be minimized as much as possible, however please note that some disruptions will be unavoidable.  Impacts will include disruptions to regular pedestrian traffic, and vehicle traffic flow at parking lot 5 and building access and noise nearby the colonnade structures due to the painting work.  

PublishedRudovsky, Michele3/15/2016

​Stephen Daniels danielss@smccd.edu 650-378-7343

Welliento Liu   liuw@smccd.edu  650-378-7346

76
  
3/28/20163/29/2016Canada Parking Lot 8 curb paintingCANParking3/28/2016 6:00 AM3/29/2016 3:00 PM

​The scope of this project is to paint the newly installed curbs at the north and east sides of Lot 8 to improve motorists and pedestrian safety

 

No parking at the north and east sides of Lot 8

PublishedKwofie, Winifred3/28/2016

kwofiew@smccd.edu

650 306 3325

81
  
3/23/20163/25/2016Canada Hillside of Lot 7 clean upCANParking3/25/2016 6:00 AM3/25/2016 9:00 AM

The scope of this project is remove weeds and litter along the hillside of Lot 7

Parking Lot 7 will be closed

PublishedKwofie, Winifred3/23/2016

​650.306.3325

kwofiew@smccd.edu

80
  
3/20/20165/7/2016Skyline Exterior Lighting Upgrades ProjectSKYParking3/21/2016 7:00 AM5/6/2016 5:00 PM

The District is replacing existing exterior lighting throughout the Campus along pedestrian pathways, roadways, and buildings. This new lighting system, integrated with the existing Facilities Management System (FMS), will enable the District to manage the lighting system in a more efficient manner resulting in energy and operational savings, improved lighting levels, and improved safety and security. 

See attached map showing areas and time frames when construction will take place on Campus.  Please note some of the more difficult locations are planned to take place the following week; i.e. during Spring Break, 3/28 – 4/1.

We apologize for any inconvenience and we look forward to the improvements to our beautiful campus.


There will be an impact to pedestrian pathways, certain parking stalls for a limited time, and traffic patterns on a limited timeframe. We will do our best on minimizing the impact to our community.


PublishedDaniels, Stephen3/18/2016

Name:Stephen Daniels, Construction Project Manager
E-mail:danielss@smccd.edu
Telephone:(650) 378-7343​


77
  
3/3/20163/7/2016Canada Curb installation on the north side of Lot 8CANParking3/3/2016 6:00 AM3/7/2016 8:00 AM

The scope of this project is to install curbs on the north side of Lot 8 to improve motorists and pedestrian safety

No Parking in Lot 8

 

PublishedKwofie, Winifred3/23/2016

​650.306.3325

kwofiew@smccd.edu

79
  
2/29/20166/30/2016DW Exterior Lighting Upgrades ProjectCSMInformation Only2/29/2016 12:00 AM4/30/2016 12:00 AM
2/29/16-3/31/16  7:00am-5:00pm

The District is replacing existing exterior lighting throughout the Campus along pedestrian pathways, roadways, and buildings. This new lighting system, integrated with the existing Building Management System (BMS), will enable the District to manage the lighting system in a more efficient manner resulting in energy and operational savings, improved lighting levels, and improved safety and security. 

See attached map showing areas and time frames when construction will take place on Campus during the month of March beginning 2/29/16.  This is the FIRST PHASE of the installation of light fixtures on campus.  More to follow.

We apologize for this inconvenience, but look forward to the improvements.

​Intermittently, access to select pedestrian pathways, certain parking stalls, roadways will be restricted for a brief timeframe.

PublishedRudovsky, Michele2/26/2016

Stephen Daniels, Construction Project Manager

(650) 378-7343

 

75http://smccd.edu/construction/
  
2/26/20163/9/2016Canada Building 17 – Exhaust Fans ReplacementCANNoise2/26/2016 6:00 AM3/9/2016 5:00 PM

Scope of this project is to install 2 exhaust fans

Drilling noise before 8am

PublishedKwofie, Winifred3/23/2016

650-306 3325

kwofiew@smccd.edu

78
  
1/8/20161/15/2016CAN B1 Gymnasium Hazardous Building Materials Survey CANDisruption1/14/2016 8:00 AM1/15/2016 1:00 PM

RGA Environmental will conduct a Hazardous Building Materials Survey of the existing Gym Building; taking samples of interior, exterior, roof, and paving materials for lab testing.

No classes or activities are scheduled in the building during this period. Building will be closed for the duration of the sampling. The samples will be taken in every room of the existing Gym Building, from the exterior wall, on the roof, and the site paving materials. The survey will be completed by 1:00PM on January 15

PublishedCheifetz, Greg1/8/2016

Greg Cheifetz

cheifetzg@smccd.edu

415-654-1773 cell
71